Modernization Integration
Abstract
Continued system integration non-recurring engineering prior to EMD. Developed the Air Vehicle Airworthiness Qualification Specification (AQS) and EMD Disposition Document completion of manufacturing tool designs for specific cockpit and cabin positions. Updated weight and balance information. Generated and provided structural, stress, and fatigue substantiation. Created manufacturing tool orders for all zones and prepared them for release. Generated preliminary manufacturing planning for the Block II Air Vehicle. Continued Ground Test Vehicle (GTV) design work. Released engineering to support test article development.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2019
- Source ID
- 24059115c4148b750bfd71575577d263