DD(X) Sys Design, Dev & Integration

Abstract

This project encompasses DDG 1000 development efforts required to deliver the Flight I DDG 1000 Class Ships. Major efforts include software requirements analysis, architectural and design code and unit testing, integration, qualification testing, and Independent Verification and Validation (IV&V) for Software Releases; execution of Integrated Power Systems (IPS) and ship control system testing and integration; Live Fire Test and Evaluation (LFT&E), Developmental Testing (DT), and Integrated Testing (IT) in support of the Test and Evaluation Master Plan (TEMP) and development of Tactical Tomahawk Weapon Control System (TTWCS) software. Funding for previous years is included in PE 0604300N and under 0204202N Project Unit 4009. Funding provided will integrate Conventional Prompt Strike (CPS) into all three ZUMWALT Class Destroyers. The funding provides a flexible, surface combatant launched long-range strike capability through the ships' remaining service life. When combined with the low observable characteristics of the ZUMWALT platform, the funds provide a compelling strike capability from a platform designed to complicate an adversaries targeting problem. Funding enables ship modifications for installation of a cold launch system common to the Ohio class SSGN and future Virginia Payload Module, with the capacity to carry up to 12 All-Up-Rounds (AUR) per ship.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2022
Source ID
2464_0204202N_5_1319_PB_2022

Tags

Fields of Study

  • Engineering

Readers

  • Naval Mine Countermeasure Systems Development.

Related Documents