LPD Flight II Design & Total Integration
Abstract
2474 - LPD 17 Flight II is expected to functionally replace LSD-41 Class ships and LSD-49 Class ships for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. Efforts are required to continue pursuing affordability initiatives. Efforts also include Gate and Milestone (MS) reviews/documentation, Capability Development Document (CDD), Indicative/Preliminary/Contract Design (ID/PD/CD), accelerated detail design of LPD 30 and development of logistics and Test & Evaluation documentation. In addition, this program element includes the Live Fire Test & Evaluation (LFT&E) and Operational Evaluation (OPEVAL) tests required for the lead ship. Program is on track to support FY 2027 retirement of LSDs. FY 2012-FY 2014 LX(R) efforts previously budgeted in PE 0603564N.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2020
- Source ID
- 2474_0604454N_4_1319_PB_2020
Related Documents
- Root: (U)LX(R)
- Child Accomplishment: LX(R) DESIGN/TOTAL SHIP INTEGRATION
- Child Cost Item: 8382e3ef031b2d853ed21bdc4dd94f57
- Child Cost Item: 4cb093a8d44ab8c08237fb9897bab288
- Child Cost Item: e60eed25ae6b4b7ab9d64a36fe5db92d
- Child Cost Item: bbed172745acf2453a93a5c75e9c8e85
- Child Cost Item: a28ea0d70cf25a27fb166a8f7a805af7
- Child Cost Item: 6341562197a5e70ccea6dbf817c45479
- Child Cost Item: 07bcf2a79a5823d5d9192a35a501baec
- Child Cost Item: 21024a867f4007d17afb64b20609494f
- Child Cost Item: 482d7d636675cd90d1702960054b5c04
- Child Cost Item: dfb8bd1e26a785ca42ad85edf7d9e53c