LPD Flight II Design & Total Integration
Abstract
LPD 17 Flight II will replace LSD-41 Class ships and LSD-49 Class ships for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. Cost reduction and affordability efforts are required to continue pursuing affordability initiatives. This program element includes the planning & documentation for Developmental Test and Evaluation (DT&E), Live Fire Test & Evaluation (LFT&E), Operational Evaluation (OPEVAL), and Follow-on Operational Test and Evaluation (FOT&E) tests required for LPD 17 Flight II. These test events will be conducted on the lead Flight II Ship (LPD 30) or where configuration supports capabilities on earlier ships (LPD 28 or LPD 29).
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2024
- Source ID
- 2474_0604454N_4_1319_PB_2024
Related Documents
- Root: LX (R)
- Child Accomplishment: LPD Flight II DESIGN/TOTAL SHIP INTEGRATION
- Child Cost Item: b37587d11781991781a3f5466166261a
- Child Cost Item: 45589517174df079134efaec215ca8da
- Child Cost Item: a9f6d2658fae18a2da92685d5d153448
- Child Cost Item: 03e4874b26da6c83859157ada9338dd7
- Child Cost Item: 78570731e8175542f2110441a80c9ad2
- Child Cost Item: ba5b19b577052ff4116e4dd6b1a5113c
- Child Cost Item: 3093445ac2806950a1253250b3e68c27
- Child Cost Item: b7bbc9421b6e2944631754d3695a641a
- Child Cost Item: 40aa506a31cb941b7a2c813045998056
- Child Cost Item: 046e547a90a17f98e205be163a2916a0
- Child Cost Item: 0fd657bcce049076fb7303c5795ccb4c
- Child Cost Item: 169301a34009ee431495361fd86556e8
- Child Cost Item: 4ebfde61a8ec29710997e7e06dfcd8ed
- Child Cost Item: 18c5c68e77045a26615fd261e4e40c93
- Child Cost Item: 9cc256143bca8fc734cf946fd798c2f3
- Child Cost Item: b98776acab2d2b8d3ae2376f3525e7e3