Additive Manufacturing
Abstract
This project supports costs associated with the research, development, testing and evaluation of Marine Corps Systems Command acquisition process modifications, prototyping, and future logistics innovations to support the USMC Additive Manufacturing (AM) Initiative under the direction of Marine Corps Systems Command. This project invests in the 3D printing of large-scale constructs such as metal and polymer landing craft and concrete structures to include buildings and bridges. The USMC Additive Manufacturing Initiative is intended to give Marine units access to additive manufacturing techniques allowing them the opportunity to exercise innovation in the resolution of issues affecting unit combat readiness and sustainment. This effort also supports the development of procedures to enable the approval and manufacturing of items requested from Marines. This involves the development of Marine Corps Policy, the digital data repository required to share equipment technical data and part designs, a part approval process, engineering analysis and testing, establishment of facilities to produce prototype additive manufactured parts, and development of training to support the Marine Corps' use of additive manufacturing. This initiative incorporates development of strategic partnerships with other DoN Systems Commands and field activities to develop DoN Standards, Processes, and other associated acquisition activities to support future use of additive manufacturing in DoN acquisition, readiness, and sustainment.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2025
- Source ID
- 2741_0604289M_4_1319_PB_2025
Related Documents
- Root: Expeditionary Logistics
- Child Accomplishment: Additive Manufacturing
- Child Cost Item: a64a5737f9031f85d14680a934ce765b
- Child Cost Item: ad058f58d9bbbcbc1a6820eca6db2382
- Child Cost Item: aedb071e37b5b5b2c3ef7e9b8ad31e61
- Child Cost Item: c0bceee3ee234ca245a84ec3543bb951
- Child Cost Item: 4398b5ba7660f90a193d1a30aa64b104
- Child Cost Item: 99d4612eddbb3c7ee87bc730eadf604d
- Child Cost Item: 6cd23323c926b078b3cb124f62ec29aa
- Child Cost Item: 30fdafedb914c6542c2274da43d75bfe
- Child Cost Item: 7a479020386f52f5ee51680c3366ff50
- Child Cost Item: b36264c703015199a31cefefbd67e6e1