Armored Multi-Purpose Vehicle (AMPV) Product Development

Abstract

AMPV Product Development costs include all efforts provided under the AMPV Engineering and Manufacturing Development (EMD) prime contract along with Government Furnished Material (GFM). Significant examples of prime contract effort include: development engineering, system engineering/program management, prototype hardware procurement, prototype system level fabrication and integration, software development, support to the government test program, and oversight of subcontractors/suppliers. Also included are all efforts performed by subcontractors / suppliers who are under contract to the AMPV EMD prime contractor. This element also includes the recurring manufacturing cost to procure the vehicles that will support Full-Up System Level (FUSL) live fire testing.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2021
Source ID
2ac5ed14eb37b053a65d35b0697bb1b2

Tags

Readers

  • Government Contracting/Procurement.
  • Unmanned Aerial System (UAS) Autonomous Capabilities and Mission Reconnaissance.

Related Documents