Site Activation

Abstract

Provide site design, security; temporary facilities; utilities; administrative communications equipment and services; infrastructure modifications; generator and commercial power; leased vehicles; material handling equipment; generator fuel; supplies, barriers; guard shacks; temporary lighting; transportation of materials and equipment; translators; and emerging requirements as site activation progresses and until sites are transferred to the Navy. Accomplishments include: - Provide temporary site activation facilities, base operations support, utilities, administrative communications, on-site material handling equipment services, and equipment installation - Fuel for facility commissioning activities, backup generators, and on-site vehicle support - Technical support to facilitate processing facility change proposals and construction modifications - Post-award technical services (structural, mechanical, and electrical) to ensure quality standards and construction schedule is met - Provide HEMP validation and verification testing of the Aegis Ashore facilities Specific and/or unique accomplishments to each FY are as follows:

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2025
Source ID
2f5b16abff0039ac250bc034e53893d6

Tags

Readers

  • Electrical Engineering
  • Facility/Structural Engineering.
  • Missile Defense Systems.

Related Documents