WGS Beam Optimization & Operational Management (BOOM) Planning Development, Systems Integration, and Test
Abstract
Starting in FY 2024, the previously titled WGS-11+ BOOM Major Thrust has been renamed, and the efforts have been segregated into four distinct thrust efforts. This Major Thrust, renamed to WGS-BOOM Planning Development, Systems Integration, and Test, continues efforts previously included in the FY 2023 WGS-11+ BOOM Major Trust for the overall planning, overarching systems integration, and testing effort. The remaining key WGS-BOOM beam planning development activities included are broken out into separate thrusts for GSSCE, CNPS, and PCMS. Develop and integrate WGS-11 & 12 advanced beam management capabilities driving improved warfighter ability to rapidly re-plan WGS-11 & 12 expanded coverage. Mature technical baseline and interface requirements for BOOM. Perform as the Government systems integrator through acquiring, designing, testing, and integrating the three key BOOM development segments and external interfaces with WGS. Support, configure, and conduct integrated testing of GSCCE, CNPS, and PCMS BOOM development efforts. Manage the MILSATCOM system architecture, refine interface requirements, and validate concept of operations through integrated system performance demonstrations. Leverage external WGS-11 & 12 interfaces to test and support planning, situational awareness, power control, and real time equipment orchestration.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2024
- Source ID
- 2f647d8107c9740924dd75440ed26482