CH-53K Development
Abstract
The CH-53 is the only marinized heavy-lift helicopter in the world and is the Marine Corps only heavy-lift helicopter. The CH-53 mission is the conduct of expeditionary heavy-lift assault transport of armored vehicles, equipment and personnel to support distributed operations deep inland from a sea-based center of operations. The CH-53E "Super Stallion" was introduced into operations in 1980 as an upgrade version of the CH-53D. The CH-53E has developed performance degradation, fatigue life, interoperability, maintenance supportability, and other operational concerns. An improved CH-53 is needed to support Marine Air-Ground Task Force heavy-lift requirements in the 21st century joint environment. The CH-53K "King Stallion" will provide improvements in range and payload, performance, cargo handling, turn-around times, reliability and maintainability, interoperability, and survivability. The CH-53K program is required to provide full system capability, including shipboard compatibilities, at Initial Operational Capability (IOC). Total aircraft quantities for the CH-53K program are 205 helicopters. This includes one Ground Test Vehicle (GTV) and four Engineering Development Models (EDMs) for System Development and Demonstration (SDD), to be purchased with Research, Development, Test & Evaluation (RDT&E) funds. Of the remaining 200 aircraft, six will be System Demonstration Test Articles (SDTAs) and will be incrementally funded using RDT&E funds. The SDTAs will be used to prove out production and integration processes on a pilot production line, and to provide aircraft for Initial Operational Test and Evaluation. SDTAs are shown in the year of contract award vice year of delivery. The remaining 194 aircraft will be Aircraft Procurement, Navy funded. This is not a New Start program. Funding was realigned from PE 0605212N /CH-53K to this PE 0605212M /CH-53K. FY19 RDT&E funds CH-53K SDD activities to include additional ground and flight test of one GTV, four EDMs and four SDTAs, associated subsystems and components, and the continued fabrication and assembly of the remaining two SDTA aircraft.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2019
- Source ID
- 3059_0605212M_5_1319_PB_2019
Related Documents
- Root: CH-53K
- Child Accomplishment: Air Vehicle Development
- Child Accomplishment: Integrated Logistics Support and Test & Evaluation (T&E)
- Child Accomplishment: Systems Engineering & Project Management
- Child Cost Item: 6aaf97dab100efab25fa26277f76a22a
- Child Cost Item: 6aa561b0611afbe8dd1f863f3fc4762c
- Child Cost Item: 78773caeb5d795a83b16ae5b395ef74a
- Child Cost Item: 71f66ea8679cca53878ec6110106776f
- Child Cost Item: 9803a193d84830b2f531e26e3a34c219
- Child Cost Item: 2bb50d803d673e09fc65437c13bc09f7
- Child Cost Item: c7d1fc0f5ac21fb24367aacfcdeaff30
- Child Cost Item: 6e46267046b09d6116934a42db9e7f2a
- Child Cost Item: b0b067863bc7d963f7e7e409ec8e36b4
- Child Cost Item: 4e2e25389e818dd218adeab0adc3ec88
- Child Cost Item: 0eecb52e4970d8c4fa5b9d9a543d79a9
- Child Cost Item: 4efe2ab6cedfa47001a23c5a64a8174e
- Child Cost Item: 961e099c009cf620d9abf2826c53bc9c
- Child Cost Item: 0da8eba2f8ed1fcbdc5c06fc9e987d92
- Child Cost Item: 3dec43f73ace989aeb5b9766dd30412a
- Child Cost Item: beb5e6d6be6351814260104fc573bda5
- Child Cost Item: 78bd24ad2aae5dd704aa7a6c37364d03
- Child Cost Item: a1da7bf668ab36ef20ee220c6ff43123
- Child Cost Item: 35fdd97b3acef37886471109833a29e7
- Child Cost Item: 5325f507db7af93805935b06ad334aec
- Child Cost Item: 816234f303ccb49b65695e9d84fdc166
- Child Cost Item: cd5c5e128adc13bfb8229d5a28b3b57c
- Child Cost Item: 842c0616db15459dea1cc9e238acb9bb
- Child Cost Item: 9931d69ec8af5a37c4011c09ff7c3d68
- Child Cost Item: 4f2b8dcdf000c04513d92741bce7a9a7
- Child Cost Item: 47624e298188d2e5a8ef0a27447197be