Assured PNT related Integration Risk Mitigation - NA2 for Weapons and Munitions Phase 2

Abstract

Perform NA2 systems of systems capability integration and pre system qualification integration risk reduction activities. Improve initial prototype NA2 capability and initiate improved prototype for subsequent transition to corresponding PoRs. Inform future NAVWAR related weapons and munitions platform dependencies. Integrate and synchronize AltNav capability delivery within NA2 to meet A-PNT CFT AltNav Directed Requirement which summarizes the urgent need for AltNav initial operational capability in two Brigade Combat Teams NLT 1QFY24.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2021
Source ID
30cec3c6ce951228147e01d04b156687

Tags

Readers

  • Aviation Safety and Air Traffic Management
  • Munitions and Ordnance Engineering
  • Positioning, Navigation, and Timing (PNT) Technology.

Related Documents