SSC Construction
Abstract
This project funds the Ship to Shore Connector (SSC) construction phase which includes the construction of the test and training craft, and includes Detail Design, procurement of one Full Motion Trainer, Integrated Logistics Support (ILS), Government Furnished Equipment (GFE), Program support, and Outfitting and Post Delivery. The SSC program provides the surface assualt portion of the Joint Expeditionary Maneuver Warfare tactical solution set requirement to project, sustain, retrograde and re-employ joint combat power from the sea and Sea Base, independent of tides, water depth, underwater obstacles or beach gradient. The lead craft will be maintained as a test platform throughout its life cycle to allow analysis and test of fixes to problems as they arise during fleet introduction of SSC. The SSC program provides the functional replacement for the LCAC Class of ships, which begin reaching extended service life in 2014. Budget breakout for Test and Training Craft being procured under this PE/Project: Plans: TOTAL 48.7 (FY11 26.6) Basic Construction TOTAL 161.6 (FY11 41.8) Change Orders TOTAL 8.3 (FY11 1.6) Electronics TOTAL 0.3 (FY11 0.3) HME/Other Support TOTAL 52.4 (FY11 14.1) Ship Total TOTAL 267.3 (FY11 80.4)
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2011
- Source ID
- 3137_0604567N_5_1319_PB_2011
Related Documents
- Root: Ship Contract Design/ Live Fire T&E
- Child Accomplishment: SSC Construction
- Child Cost Item: 0e322a0a3506c9b3364ce2be321e17ab
- Child Cost Item: c77f6c9ddc60ef52f3c95df8767c8b30
- Child Cost Item: 141edfd6789fc665689e6d5d0442b2ee
- Child Cost Item: 3a0303d09b9cc68d1a6c848c2de7e0d2
- Child Cost Item: fa187dfd0e6772afd50e865e12f8e39f
- Child Cost Item: 7c40fa05fc4e9ca2f55b424e05390885
- Child Cost Item: 57b63fd7b7ffcba3a8d44cdb37a92a83
- Child Cost Item: 604f09d26f8bb268776659a7666cb0e6
- Child Cost Item: 29387d58ee8f73acf400161873a71c52