SSC Construction
Abstract
This project funds the Ship to Shore Connector (SSC) Engineering & Manufacturing Development phase which includes Detail Design and Construction of the Test and Training Craft, Integrated Logistics Support (ILS), Government Furnished Equipment (GFE), Program support, and Outfitting and Post Delivery. The SSC program provides the capability to rapidly move assault forces within the littoral operational environment to accomplish Unified Command Plan (UCP) missions, and ensures the Joint Force Commander's (JFCDR's) ability to conduct amphibious operations and operate over the high water mark, including movement over ice, mud, rivers, swamps and marshes. The lead craft will be maintained as a test and training platform throughout its life cycle. The SSC program provides the functional replacement for the LCAC Class of ships, which begin reaching extended service life in 2015. Plans: TOTAL 42.7 (FY12 18.1) Basic Construction: TOTAL 174.4 (FY12 45.4) Change Orders: TOTAL 9.3 (FY12 3.4) Electronics TOTAL 0.2 (FY12 0.1) HME: TOTAL 19.3 (FY12 9.1) OTHER SUPPORT: TOTAL 41.1 (FY12 16.4) POST DELIVERY/OUTFITTING: TOTAL 1.2 (FY12 0.0) Ship Total: TOTAL 288.2(FY12 92.5)
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2012
- Source ID
- 3137_0604567N_5_1319_PB_2012
Related Documents
- Root: Ship Contract Design/ Live Fire T&E
- Child Accomplishment: SSC Construction
- Child Cost Item: ab9e3c0201f9f2d8fe5274198f43d331
- Child Cost Item: 99cf759e3bb8ee95d92445a0d2d11657
- Child Cost Item: 867a8e975adfcb672fba8b50ff1fba40
- Child Cost Item: a688b673076d9f443cfcdc5139d59edf
- Child Cost Item: 195f18750dc43878d98aaaea2947099d
- Child Cost Item: ddd1213b26d91a651a68c9071e84286a
- Child Cost Item: 06199352c9bd3c4f7720cadd3a9ae8c3
- Child Cost Item: b45352ff12881fcee969a94485de04c9
- Child Cost Item: aaf2a768b4f6d03bc735bb662b57f01d
- Child Cost Item: e3202e941bd49141191f8b7eff28951c