SSC Construction
Abstract
Note: Funding for this project unit effort is realigned from PE 0604567N Project 3133. Project is not a new start. This project funds the Ship to Shore Connector (SSC) Engineering & Manufacturing Development phase which includes Detail Design and Construction, Product Support, Government Furnished Equipment (GFE), Program support, and Outfitting and Post Delivery for the first two craft. The lead craft will be maintained as a test and training platform throughout its life cycle. The second craft (Craft 101) will be available to support IOT&E as needed, but will be a fleet asset after delivery. The SSC program provides the capability to rapidly move assault forces within the littoral operational environment to accomplish Unified Command Plan (UCP) missions, and ensures the Joint Force Commander's (JFCDR's) ability to conduct amphibious operations and operate over the high water mark, including movement over ice, mud, rivers, swamps and marshes. The SSC program provides the functional replacement for the LCAC crafts, which begin reaching extended service life in 2015. Below reflects total program funding for Craft 100 and Craft 101 in project 3137, between PE 0604567N and PE 0605220N. TEST AND TRAINING CRAFT 100: Plans/Basic Construction: TOTAL 226.6 (FY15 31.0) Change Orders: TOTAL 13.9 (FY15 3.8) Electronics TOTAL 9.2 (FY15 .3) HM&E: TOTAL 27.9 (FY15 1.3) Other Support: TOTAL 43.5 (FY15 7.9) Ordnance Total 0.05 (FY15 0.05) Post Delivery/Outfitting: TOTAL 2.0 (FY15 0.0) Ship Total: TOTAL 323.2 (FY15 44.4) CRAFT 101: Basic Construction TOTAL 51.0 (FY15 14.7) Change Orders: TOTAL 2.2 (FY15 1.1) Electronics: TOTAL: 2.2 (FY15 .4) HM&E TOTAL: 3.7 (FY15 0.8) Other Support TOTAL: 14.1(FY15 3.0) Ordnance TOTAL 0.05 (FY15 0.05) Post Delivery/Outfitting TOTAL 2.0 (FY15 0.0) Ship Total: TOTAL 75.3 (FY15 20.0)
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2015
- Source ID
- 3137_0605220N_5_1319_PB_2015
Related Documents
- Root: Ship to Shore Connector (SSC)
- Child Accomplishment: SSC Construction
- Child Cost Item: 38ad7f0fbb7bb983a1eff166c93f8419
- Child Cost Item: 241154a1a8b730eb174c0159a73d85a9
- Child Cost Item: a7fab6ef420122a8832edc2392a7ebef
- Child Cost Item: fb591dbf6478cc9c0b05a2eda63caa74
- Child Cost Item: 4ee9d10ca0966b885d9bc23f2a7c7e15
- Child Cost Item: 8b20856a4b17aae093c0ea961fac21b6
- Child Cost Item: 8ff5ac92694c213123f5dec0275276bb
- Child Cost Item: 869a2c5b6b80b10906543f1eea119e13
- Child Cost Item: 5254b101809e1d61d58dd696d397a09a
- Child Cost Item: 0eb809ead99b821c25727339d299a901
- Child Cost Item: 78f344a7f9eb83fbe7aa195802f2f3c1
- Child Cost Item: 38f7072c52272b05492c9c83412c0f6c
- Child Cost Item: e73ae36a6383eb4ec77acea1d9bffeed
- Child Cost Item: 590e613e3b13705be1ac6af76dec024f
- Child Cost Item: 67c136747bdf819f117bf6478becd3b2
- Child Cost Item: 3d202acca13618cb103827f3e9ce2234
- Child Cost Item: 4135fa4fb21f716155f71e303657b626
- Child Cost Item: d2f7a2488a30a25872f5dfc093d9c665