SSC Construction

Abstract

This project funds the Ship to Shore Connector (SSC) Engineering & Manufacturing Development phase which includes Detail Design and Construction, Product Support, Government Furnished Equipment (GFE), Program support, and Outfitting and Post Delivery. The lead craft will be maintained as a test and training platform throughout its life cycle. The SSC program provides the capability to rapidly move assault forces within the littoral operational environment to accomplish Unified Command Plan (UCP) missions, and ensures the Joint Force Commander's (JFCDR's) ability to conduct amphibious operations and operate over the high water mark, including movement over ice, mud, rivers, swamps and marshes. The SSC program provides the functional replacement for the LCAC craft, which begin reaching extended service life in 2015. Funding for this project unit effort is executed under PE 0605220N in FY15 and out. Below end cost for Craft 100 and R&D cost for Craft 101 reflects total program funding in project 3137 between PE 0604567N and PE 0605220N. P.L. 113-235 transfers Craft 101 to SCN 5112 for FY15. The total RDT&E,N funding for craft 101 is $34.1M (FY 13 and FY 14). TEST AND TRAINING CRAFT 100: Plans/Basic Construction: TOTAL 226.6 (FY16 0.0) Change Orders: TOTAL 16.2 (FY16 0.0) Electronics TOTAL 9.6 (FY16 0.2) HM&E: TOTAL 31.0 (FY16 2.7) Other Support: TOTAL 30.0 (FY16 1.7) Ordnance Total 0.05 (FY16 0.0) Post Delivery/Outfitting: TOTAL 4.0 (FY16 0.0) Ship Total: TOTAL 317.4 (FY16 4.6)

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2016
Source ID
3137_0605220N_5_1319_PB_2016

Tags

Readers

  • Maritime and Naval Warfare Studies
  • Naval Mine Countermeasure Systems Development.
  • Public Financial Management and Budgeting

Technology Areas

  • Microelectronics

Related Documents