Technology Refresh 3 (TR-3)

Abstract

TR-3 conducts post CDR design activities. This effort will develop and deliver a TR-3 system through full flight-worthy certification and production readiness review for Lot 15. The design of TR-3 subsystems ICP, AMS, PCD-EU, and PCD-DU configurations will contain new backplane technology, commercial operating systems, and modified middleware necessary to support Block 3F functionality and incorporation of all Block 4 capabilities. This work includes nonrecurring engineering for the development, test, and certification of the ICP, AMS, PCD-EU, and PCD-DU, and includes processing capacity to ensure long term viability for future capabilities.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2025
Source ID
31a5616f534ae331baedf15b09c4e3fa

Tags

Readers

  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Geochemistry

Related Documents