SBSD Advanced Submarine System Development
Abstract
The Sea Based Strategic Deterrent (SBSD) Advanced Submarine System Development project supports the COLUMBIA SSBN program. The funding applies to the design, systems engineering, prototyping, and vendor qualification activities needed to execute the schedule for Common Missile Compartment (CMC) design, whole ship design, and component technologies development for the next generation U.S. ballistic missile submarine (SSBN). This RDT&E program supports cooperation with the United Kingdom (UK) to maintain strategic deterrence, based on a single effort to develop a CMC as agreed by the UK Secretary of State for Defense and the U.S. Secretary of Defense in 2009. The COLUMBIA program strategy is to maximize the re-use of existing OHIO systems and new designs from the SEAWOLF and VIRGINIA Classes (as applicable), focus on Life Cycle Total Ownership Cost (TOC) affordability, and meet the military requirements established for this SSBN to achieve mission success in a challenging environment. The requested funding levels provide for the Technology Development, Design, and Engineering Integration efforts necessary to support the Columbia Class SSBN lead ship construction start in FY 2021. The following key activities support a ship acquisition program to replace the OHIO Class SSBNs: 1. Design and development of a missile compartment, launch system, and strategic weapons support systems to meet U.S. strategic requirements while cooperating with the UK on modernizing its strategic deterrent in accordance with Presidential direction (December 2006). 2. Concept, System Definition, and Detailed Design for remaining portions of the ship will be accomplished through a Design/Build/Sustain approach modeled after the approach used by the VIRGINIA Class program. 3. Engineering and integration of existing technologies and development of new technologies required to provide the capabilities necessary to ensure platform operational effectiveness and minimize life cycle cost. COLUMBIA SSBN program's Concept Definition, System Definition Prototyping, and Technology Development Efforts supports design, systems engineering, prototyping and vendor qualification activities needed to develop the CMC design, the COLUMBIA whole ship design, and component development. The COLUMBIA design timelines are based on a design approach proven on the VIRGINIA Class Program, adjusted for the additional complexity of a missile compartment and Strategic Weapons Systems (SWS). Planned technical studies and prototyping are necessary to reduce risks associated with updating SSBN system designs for current technical standards and demonstrating design feasibility of developmental technology to meet the ship design and construction schedule. The Navy continues investing in program funded affordability initiatives similar to those employed successfully for VIRGINIA Class, but tailored to the unique SSBN mission and operational tempo of COLUMBIA Class to drive down overall program costs. Efforts will focus on reducing ship construction costs through implementing more effective design features and production methods to produce a more affordable/producible submarine. As part of this effort, alternative contracting strategies are also being examined to include multi-class multiyear procurement (MYP) and Economic Order Quantity (EOQ). Activities for FY 2016 were executed to ensure the first article quad pack prototype of the CMC remains on schedule to support the UK DREADNOUGHT Program. These activities included the start of construction for the first article quad pack in August 2016 with a planned completion in the fall of 2018. The CMC program will mature required technologies and re-host the TRIDENT II D5 SWS (Launcher, Fire Control and Navigation) while ensuring no degradation to D5 security, safety and performance. In addition, whole ship design efforts are focused on technologies requiring significant engineering, integration and development time as well as those technologies that are required to support ship design and construction schedules such as the propulsor and maneuvering/ship control. These technologies are critical for stealth capability for a ship class that will be in service until the 2080s. Ship detailed design efforts include important pre-construction activities such as finalizing ship requirements, risk characterization and mitigation, improvement and validation of performance prediction tools and improvement of design tools. Technology development will address engineering and integration of existing technologies as well as maturation of developmental technologies. PB 18 funding levels align with Milestone B Cost Component Position (CCP). On 14 December 2016, the Secretary of the Navy announced the lead ship of the OHIO Replacement Program will be USS COLUMBIA (SSBN 826) which officially designates this program the COLUMBIA Class Submarine Program.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2018
- Source ID
- 3220_0603595N_4_1319_PB_2018
Related Documents
- Root: (U)Ohio Replacement
- Child Accomplishment: Common Missile Compartment Design and Prototyping
- Child Accomplishment: NAVSEA R&D and Prototyping
- Child Accomplishment: Systems Engineering/Program Management
- Child Accomplishment: Strategic Weapons Systems Integration
- Child Cost Item: 0e0137ba857e7976f8765f3bcaaca613
- Child Cost Item: 0457ba7d03cb84d768d564a6d9adef41
- Child Cost Item: c7de5461351cc78fd31a5f4d072b9317
- Child Cost Item: 542ad7d5e045d3a7c98ae43ae86157bd
- Child Cost Item: 84b6bf2f3b0d7bbf7827afd16aa6af75
- Child Cost Item: 4eac97d5546e2e99a3f688f0b5266b3c
- Child Cost Item: faaa4393c80df663af3fa84762df294a
- Child Cost Item: 8a4b84dc96b9c12f14ae162e28999c59
- Child Cost Item: 06c1ad13f73064df8228737002da89aa
- Child Cost Item: 7227df8862e46855c1bc534691ec0b8a
- Child Cost Item: 3b2bad64be768feff9814d772de221ba
- Child Cost Item: 218680f1e0b0c8d8b56824c8249a3ae7
- Child Cost Item: 2e6e1cc5d079abb9c0bc9fb766117251
- Child Cost Item: a10e47845f2a1de13736fec7fdcd6dbf
- Child Cost Item: 8ce58e61a71034e0ebb629143abda420
- Child Cost Item: f0be31877167db1e187a111254eb9c94
- Child Cost Item: 6334671ded655912b7ad1ffdae99f809
- Child Cost Item: bffcd771674878fb1e23694539306cbd
- Child Cost Item: 5dbd36f6c848f9fcc2529ad45cd6f31d
- Child Cost Item: 21c60dce8d6f0f9dc3bb675d3e7c0af1
- Child Cost Item: 276b56992b8084f6e43e30af1c33587e
- Child Cost Item: 178afa24b61759c7477a6f9e17f1f63b
- Child Cost Item: a2b4313614fed0779ad271b251067dde
- Child Cost Item: 4dbb03bee186eff233d71b39a983f374
- Child Cost Item: 289aa5cee87ea8fd9130a0fb633f5087
- Child Cost Item: 26e4883f07cde1042fdb88a3ed6cad8d
- Child Cost Item: 1ff8f320eb8bb0abc03415fb064449aa
- Child Cost Item: 7093cb8559a311f6a2c0c58f34e82ce9
- Child Cost Item: bcd1cc1ecadb990c20aa240d5e27366b