T62 Auxiliary Power Unit (APU)
Abstract
Provide timely responses to technical problems arising in the field during operational use. Review operational and repair reports, perform engineering analysis of failed engines and equipment. Perform investigation and testing as required to isolate/verify reported field problems and service revealed deficiencies (SRDs).
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2016
- Source ID
- 328c50a86fe90f2df3e2edf82d186a56