Ground Updates

Abstract

Modify and upgrade the existing EPS CAPS to provide command and control and XDR mission planning capability for the two new payloads.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2022
Source ID
32a5456c812a1a34e8178682de06ce76

Tags

Fields of Study

  • Physics

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control

Related Documents