Project NAUTICA: Integrated Theater ASW C4I
Abstract
Effective FY 2019, a new initiative titled NAUTICA is established for TUSW architecture development, systems engineering, and design (+$10.2M). Significantly, the new initiative integrates intelligence (operational and tactical) and sensor (national and organic) systems to provide a fully informed COP of enemy undersea forces, maximizing decision superiority and theater level planning, and address TUSW C2. The Navy plan for NAUTICA was approved by the June 2017 Flag Oversight Board and subsequently a roadmap was developed in FY 2018. Near term, FY 2019 accelerates development of the interfaces to federate existing "stove piped" systems. FY 2019 funding will also accelerate (from outside the FYDP) the start of the system engineering required to develop and deliver an integrated TUSW capability In Accordance With (IAW) the 2007 ASW ICD. The plan prioritizes NAUTICA investments IAW the Commander U.S. Fleet Forces endorsement of "Theater ASW Capability Requirements" Letter (24 February 2017). FY 2019 funding federates existing systems by rapid prototyping of the designs and interfaces for existing legacy systems to be interoperable by FY 2020, and commences the accelerated design phase for a system of systems TUSW architecture to enable the existing programs of record under development from PWO IWS, PEO C4I, PEO AIR, and N9SP to deliver in the FYDP. Critical to this effort will be the development of the Cross Domain interface that will enable DCGS-N and USW-DSS to exchange and display information at the appropriate classifications. Funding under this project establishes the systems engineering activities required to accelerate development of TASW capabilities. It will establish a transition path for the Operational Planning Tool (OPT), Waterspace Planner (WASP), Battle Management TDA, and other FNCs that will start to transition TRL 5/6 enabling technologies into the USW-DSS and DCGSN PORs. The funding will support TASW C2 experimentation at existing facilities for rapid innovation prototyping and provide a transition path for Phase II SBIR projects that will mature in the FY 2019/2020 timeframe.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2019
- Source ID
- 3439_0604518N_5_1319_PB_2019
Related Documents
- Root: Combat Information Center Conv
- Child Accomplishment: NAUTICA - Theater Architecture Development and System Integration
- Child Cost Item: 9b79635188e119d057eddab9798d94f8
- Child Cost Item: f65eac526efb3569dfd799411d645ff2
- Child Cost Item: 100f16bc10459a8866820252abab4a3a
- Child Cost Item: 9c2032e8b5a76ac296a0b49089311a91
- Child Cost Item: f90b5b0937e515e8106ec0dd545b9e33
- Child Cost Item: f559851e356875f0853dc685cd234324
- Child Cost Item: be3686d67a53d402c93eafe8a50a9d5d
- Child Cost Item: df255c3aac7b66072fecef1b31facce9
- Child Cost Item: 14167e66ede806a1c9a31c48fed6ead3
- Child Cost Item: 7f8a59d46fbdbcdc0af67334bb2aea48
- Child Cost Item: df47f53f5b33e243d5b3e17409fb4c42
- Child Cost Item: 3f7ccdf5f44454975fd7ad76938f1eaa
- Child Cost Item: 6c9cea2dbaa2817ddd8b321ade62a9a4
- Child Cost Item: ac21cff9e968102c22267e51775e480a
- Child Cost Item: 4305315e68c913343b3c51f4003df667
- Child Cost Item: 189456d14be999d56e8bb21c294dc719