Design development, developmental testing, operational testing.

Abstract

While terminating the EFV program, FY10 and FY11 funds will be utilized to support and complete certain development and testing efforts that will be integral to future amphibious vehicle development. FY11 funds reliability growth design and development, development and reliability growth testing, and engineering and logistics support that have already been accomplished, and completes the effort through KP-2. The completion of these efforts will provide validated systems engineering and process models and initial design data valuable to the development of future Marine Corps requirements.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
3997ac085a6c16d69e5b51655ae9232c

Tags

Fields of Study

  • Engineering

Readers

  • Maritime Combat Support and Expeditionary Logistics.
  • Naval Mine Countermeasure Systems Development.
  • Software Engineering

Related Documents