DEAMS T&E

Abstract

The DT&E process will be a complete system test to validate system software requirements and compliance mandates are satisfied. The DT&E efforts will be conducted at a SI test site, CIE and DISA production sites. The DEAMS Integrated Test Plan (ITP) and the Increment 1 SI Software Test Plan (STP) cover the details of DEAMS DT&E.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
3b093cf4ddf5a2031b78b6ae347ebdff

Tags

Fields of Study

  • Computer science

Readers

  • Aerospace Engineering.
  • Defense Financial Management and Audit.
  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.

Related Documents