Line of Communication Bridge (LOCB)
Abstract
Funding requested for development and testing of higher Military Load Classification (MLC) modular Line of Communication Bridging with the mobility to span fixed or float gaps spanning 50 to 800 meters wide. Actions include bridge structural strength analysis, performance assessments, and Production Qualification Testing (PQT) of the Line of Communication Bridge (LOCB) system.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2021
- Source ID
- 3ec9cf46bff9a10bce263ef42e342f2d