A2AD
Abstract
This project funds Anti-Access / Area Denial (A2AD) engineering change proposal (ECP) upgrades to the navigation and communication of the Tactical Tomahawk (TACTOM). TACTOM navigation modernization will enable launch via a fine alignment solution and navigation using TERCOM/DSMAC/Vertical Update Point in a GPS denied/degraded environment. TACTOM communications development replaces 5Khz DAMA with Advanced Communication Architecture (ACA) leveraging National Technical Means (NTM), replacing the Satellite Data Link Terminal (SDLT) with an Integrated Single Box Solution (ISBS) that combines Dual Transmit and Receive Capability in a single box, replacing existing UHF antenna and adding a second band antenna.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2019
- Source ID
- 4032_0204229N_7_1319_PB_2019
Related Documents
- Root: Tomahawk Mssn Planning Ctr
- Child Accomplishment: Anti-Access/Area Denial
- Child Cost Item: 4f42ad48d89a13ccc2fe6f5b50b9f09f
- Child Cost Item: 76bf6b95e9f041cb8005a67f6b64d4b1
- Child Cost Item: e30d155b6c96f9e7b0ebf9f751fac3c5
- Child Cost Item: 7a4be3126261bc2a4c07ddbad9c2c46d
- Child Cost Item: b8c15b4340ce89e0629cfeef5164b282