Ground Updates

Abstract

Modify and upgrade the existing EPS CAPS to provide command and control and XDR mission planning capability for the two new payloads.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2021
Source ID
42f54af490ff04bcbc7ae13544d1b532

Tags

Fields of Study

  • Physics

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control

Related Documents