Ordnance PHST Development

Abstract

Develop new OHE to replace the 25+ year old equipment presently in Fleet use to include: 1) Re-design Mk 105 Pendant Sling to optimize cost and throughput during Vertical Replenishment; 2) New concept development to replace 12x12 and 14x14 ft. Nylon Cargo Nets ; 3) Design a new Standard Tension Replacement Alongside Method (STREAM) Strongback to compliment the Fleet's Heavy UNREP initiative of the future; 4) Condense Mk 85, 86, 87, and 100 family of pallet slings into fewer pieces gear to optimize cost and efficiency during CONREP; and 5) Re-design the Mk 45 Handlift Truck. Ordnance PHST will additionally conduct a baseline study of the current Naval PHST logistics system to identify inefficiencies and recommend hardware and operational enhancements.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2014
Source ID
48de8e6374d6b1e1302437fb72d5c831

Tags

Readers

  • Life Cycle Cost Analysis
  • Logistics and Supply Chain Management.
  • Naval Architecture and Marine Engineering.

Related Documents