Release 1 and Release 2
Abstract
Release 1 and Release 2 continue execution of a subset of work previously performed under the System Developmemt and Demonstration (SDD) effort, while rapidly integrating upgrades or improvements (including limited urgent needs) fleet-wide. Development will combine the rigor of an event driven development process (referred to as a Technology Maturation Effort (TME)) with the expeditious delivery of a schedule driven integration and fielding process (referred to as a Release). These efforts may include, but not limited to: Take off and landing Data (TOLD), MTS-B Integration, GCS Block 50, Counter IED, IP Migration, SAR Development, GCS Block 30, Extended Range, Enablers Development, Multi Transit Ops, weapons integration, OA MCM, and test on MQ-9 platform for capabilities such as rockets, missiles, bombs, guns and direct energy weapons, as well as software development required to support new capabilities.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2019
- Source ID
- 49e5c4aba0edf3914602fd6bddf8cafb
Related Documents
- Root: MQ-9 UAV