CH-47F Block II Engineering and Manufacturing Development (EMD)

Abstract

Conduct and support aircraft development, complete assembly and deliver three EMD test articles to include Advanced Chinook Rotor Blade (ACRB), airframe components, Improved Drive Train (IDT), rotor components, light weight fuel system and electrical components. Complete fabrication, assembly, initial functional checks of the Ground Test Vehicle (GTV) and remote control system (RCS), conduct GTV test operations, functional testing of the CH-47F Block II systems, Test Readiness Review (TRR) for EMD ground and flight testing. Release EMD flight test software. Begin contractor led system level ground and flight testing. Deliver documentation that demonstrates requirements verification and production configuration baseline. Continue Integrated Logistics Support (ILS) and Integrated Contractor Supply (ICS) support for initial flight test activities.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2021
Source ID
4c3fe55cd513ac5c9c2dba056faa9214

Tags

Fields of Study

  • Physics

Readers

  • Aerospace Test and Evaluation
  • Munitions and Ordnance Engineering

Related Documents