XBR Radome Replacement

Abstract

This effort funds the XBR radome replacement to remedy identified adhesion failures of the external layers and localized seam adhesion failure, including evidence of water and mold intrusion. The radome production effort is expected to complete in FY 2025, making it possible to continue SBX Homeland Defensive Operations through 2035 or longer. Installation of the radome will begin in FY 2025 and complete in early FY 2026.