Test and Evaluation

Abstract

The T&E process will be a complete system operational test to determine DEAMS effectiveness, suitability and mission capability. The T&E efforts conducted are in developer sites, Air Force test sites, DISA production sites and user locations. The T&E effort will include the implementation of the AGILE principles which includes Sprint Testing where functionality developed code in the sprint is tested for conformance to functional and non-functional requirements. Sprint Testing shall address unit and integrated testing. Additionally, there will continue to be regression testing to validate that the work within the sprint has not introduced new defects into areas of the product no directly impacted by the work of the sprint and has not introduced defects into the cross-product dependencies such as interfaces.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2021
Source ID
53bbda76f6ac4a4fc93ad3e39bbb6cdb

Tags

Readers

  • Aerospace Test and Evaluation
  • Naval Mine Countermeasure Systems Development.
  • Software Engineering.

Related Documents