Prototype Upgrade to LRIP Configuration

Abstract

After a successful Milestone C, eight (8) vehicles will be retrofitted to LRIP configuration to support LRIP phase survivability testing, logistics products development, and implementation of corrective design changes driven by failures that arise during Production Qualification Testing (PQT) and Initial Operational Test and Evaluation (IOT&E). Upgrading MPF prototypes to LRIP configuration will result in substantial cost avoidance compared with producing additional LRIP vehicles to support test requirements.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2022
Source ID
53fb960374aa560881cf0d002c626466

Tags

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Explosive Engineering.
  • Unmanned Aerial System (UAS) Autonomous Capabilities and Mission Reconnaissance.

Technology Areas

  • 5G
  • 5G - DoD 5G Program
  • 5G - Internet of Things

Related Documents