Port Improvement via Exigent Repair (PIER)

Abstract

PIER will deliver a dynamic, agile, cost effective (non-military construction) expeditionary engineering solution to rapidly repair damaged or degraded ports to a minimum level of serviceability after an attack or natural disaster. Agility is achieved through a smaller footprint, commercial off-the-shelf infusion, and quick reaction of theater-based repair assets (e.g. pre-packaged, pre-positioned). The intent of PIER is to assure continued logistics resiliency and freedom for our U.S. Forces to maneuver and conduct agile strategic sealift and logistics. PIER will allow the Department to address the doctrine, organization, training, materiel, leadership, personnel, facility, and policy (DOTMLPF+P) concerns about its ability to conduct rapid port damage repair. The plan is to transition to the U.S. Army, U.S. Navy and the Defense Logistics Agency.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2018
Source ID
5f5a7096e3ec90cecd205b4c3d8710bb

Tags

Readers

  • Coastal and Marine Engineering/Sediment Transport/Hydraulic Engineering
  • Logistics and Supply Chain Management.
  • Maritime Combat Support and Expeditionary Logistics.

Related Documents