Buoyant Roll On/Roll Off Interface Kit

Abstract

Prototype consisting of the RO/RO ramp to interface to a commercial supply vessel and a section of floating causeway and ancillary equipment sufficient to conduct a limited operational assessment

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2024
Source ID
5f997b6e3299d16030ae68af648c762c

Tags

Readers

  • Electrical Engineering
  • Naval Architecture and Marine Engineering.
  • Software Engineering

Related Documents