Enter Engineering Manufacturing, and Development (EMD) Phase
Abstract
JAGM EMD is further divided into two sub-phases: a 15-month Integrated System Design and a 33-month System Capability and Manufacturing Process Demonstration. The first of these sub-phases culminates in a successful CDR and the latter with MS C.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2012
- Source ID
- 61f790c3fee8196d18e47091a4b4c695