Enter Engineering Manufacturing, and Development (EMD) Phase

Abstract

JAGM EMD is further divided into two sub-phases: a 15-month Integrated System Design and a 33-month System Capability and Manufacturing Process Demonstration. The first of these sub-phases culminates in a successful CDR and the latter with MS C.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
61f790c3fee8196d18e47091a4b4c695

Tags

Readers

  • Naval Mine Countermeasure Systems Development.
  • Software Engineering
  • Systems Analysis and Design

Related Documents