ADVANCED WIDEBAND SYSTEM
Abstract
Fiscal constraints have led the Deparment of Defense to terminate the Transformational Satellite Communications System (TSAT) program beginning FY10. The TSAT Mission Operations System (TMOS) and Systems Engineering and Integration (SE&I) contracts were terminated on 8 June and 9 June 2009, respectively. The two Space Segment Risk Reduction and System Definition (RRSD) contracts expired on 7 July 2009. Funds are in Budget Activity 4, Advanced Component Development and Prototypes, since it funds TSAT technology development and engineering design activities including risk reduction and system definition.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2011
- Source ID
- 644944_0603845F_4_3600_PB_2011
Related Documents
- Root: Transformational SATCOM (TSAT)
- Child Accomplishment: MAJOR THRUST: Contract close-out
- Child Cost Item: fc88dded817d8aea0c28fc25be19801f
- Child Cost Item: 62278fed208bdd607c275fe15e9ef474
- Child Cost Item: 105591b774415e1357d31197be338f7c
- Child Cost Item: 2012909c7664aa7c7834c37c0a0ad1f0
- Child Cost Item: cfd9b6adfbfcce6ab50e16afa9c17b18
- Child Cost Item: 3031508d3e3c4ca583a4dcaeccdd91c1
- Child Cost Item: 6ac2611f78f613c5518739d4455e3bb5
- Child Cost Item: 68435f3c5d4e47f5be6653ae8cf2408a
- Child Cost Item: 42fe5a3228af7e38055a13d4c67a0a33
- Child Cost Item: 5db70c1f555551948d544664246481ff
- Child Cost Item: 9dd1d18be07a88a16b25e6ce5a327f10
- Child Cost Item: b5369930c18876ddec2621c46d776bae