Non-Space Systems Requirements Analysis & Maturation
Abstract
The Non-Space Systems project is responsible for analyzing documented capability needs and requirements to identify potential materiel shortfalls and opportunities; devising candidate materiel solution options to address AF non-space capability needs and shortfalls; and conducting coordinated pre-systems acquisition planning activities that address requirements, schedule, cost, technology, and acquisition strategy for air and cyber efforts.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2012
- Source ID
- 645349_0604337F_4_3600_PB_2012
Related Documents
- Root: Requirements Analysis and Maturation
- Child Accomplishment: Major Thrust 1
- Child Accomplishment: Major Thrust 2
- Child Accomplishment: Major Thrust 3
- Child Cost Item: 24e788897411e46e9fc78186e4206715
- Child Cost Item: d70c7342ffd08649ad9460c7e018a203
- Child Cost Item: 46c0144170eb8309a2f1b1e38d76c95e