Joint Strike Fighter

Abstract

The F-35 Lightning II Joint Strike Fighter program will develop and field a family of aircraft that meets the needs of the USN, USAF, USMC and allies, with maximum commonality among the variants, consistent with National Disclosure Policy, to minimize life cycle costs. This is a joint program with no executive service. Navy and Air Force each provide approximately equal shares of annual funding to the program. The United Kingdom, other International Partner nations, and Foreign Military Sales customers are also participants in the JSF program. The program shown here reflects USN, USMC, USAF, and International Partner funding. The top-line Program Element reflects USAF F-35A Conventional Take-Off and Landing (CTOL) budgetary information, only; however, funding at the accomplishment/planned program level is reported in total (all services and partners) as the activities support all aircraft variants. Within the Navy contribution is a roughly equal contribution of annual funding by the USN and USMC. The SDD Budget funds a total quantity of 20 RDT&E test articles to include 6 ground test articles and 14 flight test articles for Navy and Air Force use. The following fiscal year phasing of the flight test aircraft reflects the schedule first flight of each flight test asset or production line roll out of each ground test asset: FY07: 1 Conventional Take Off and Landing (CTOL) flight test article FY08: 1 Short Take Off and Vertical Landing ((STOVL) flight test article); 1 STOVL ground test article FY09: 1 STOVL flight test article; 2 CTOL ground test articles FY10: 6 flight test articles: 3 CTOL, 2 STOVL, 1 Carrier Variants (CV); 3 ground test articles: 1 STOVL, 2 CV FY11: 4 flight test articles: 1 CTOL, 1 STOVL, 2 CV FY12: 1 CV flight test article FY13: 0 flight test articles BA5 - This program is in Budget Activity 5, System Development and Demonstration (SDD) because it has passed Milestone B approval and is conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2013
Source ID
653831_0604800F_5_3600_PB_2013

Tags

Readers

  • Aerospace Engineering
  • European Security and Defence Policy (ESDP).

Related Documents