Support Equipment
Abstract
The ongoing Support Equipment program designs, develops and tests support equipment necessary to extend the operational life of the Minuteman (MM) III Weapon System throught 2030. The production phase, MPAF 3020 funding, is budgeted under MMIII Support Equipment Replacement, PE 0101213F,
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2011
- Source ID
- 655037_0604851F_5_3600_PB_2011
Related Documents
- Root: ICBM - EMD
- Child Accomplishment: MAJOR THRUST: Design and develop the Electrical-Electronic Equipment Test Set (EEETS) necessary for production/pre-launch checkout of MOD 7 wafer required for the ongoing test launch program.
- Child Accomplishment: MAJOR THRUST: Design and develop Reentry Field Support Equipment (RFSE) to replace the current reentry systems test set.
- Child Accomplishment: MAJOR THRUST: The Minuteman Code System Media (CSM) effort will develop software to support management of data flow and data products to get the Minuteman III weapon system into operational mode.
- Child Accomplishment: MAJOR THRUST: Design and develop the capabilities necessary to replace the current Payload Transporter Tractor and Trailer (PT3), mitigating emerging threat technologies and methods.
- Child Accomplishment: MAJOR THRUST: Design and develop the replacement for the Higher Authority Command/Rapid Message Processing Element (HAC/RMPE) message generator due to obsolescence and unsupportability for repair.
- Child Cost Item: 73b3d81c0b581c8146787f3d8ed03127
- Child Cost Item: 6ca47c13e9f1dbe62e7e0ed76bc5167f
- Child Cost Item: 7f77b200f0b39fc9ac6368ac6c98d165
- Child Cost Item: 629ad33d3b5097cd7a3f5879ed6e50bf
- Child Cost Item: b6e78d487d6f373287197f7a2c1d4d48