Small Diameter Bomb Increment II
Abstract
Small Diameter Bomb Increment II (SDB II) is a joint interest program providing the warfighter a capability to attack mobile targets from stand-off in weather. SDB II addresses the following warfighter requirements: attack mobile targets, adverse weather operations, multiple kills per pass, multiple ordnance carriage, precision munitions capability, capability against fixed targets, reduced munitions footprint, increased weapons effectiveness, minimized potential for collateral damage, reduced susceptibility of munitions to countermeasures and provides a migration path to net-centric ops capability. Threshold aircraft are the F-15E (USAF), F-35B (USMC), and F-35C (USN). Objective aircraft include: F-22A, F-35A, F-16, B-2, A-10, MQ-9, B-1, B-52, and the F/A-18 E/F. SDB II will be compatible with the BRU-61 miniature munitions carriage and the SDB I container systems. SDB II began a competitive Risk Reduction phase in FY06 and Milestone B is scheduled in FY10. Milestone C is planned for FY13 followed by RAA on the F-15E in FY14. The Navy Initial Operating Capability (IOC) is scheduled for FY16 on the F-35B and the F-35C. While the complete hardware and software for normal attack, Coordinate Attack (CA), and Semi-Active Laser (SAL) attack will be developed and in place by FY14, only the normal attack capability will be verified and released by FY14. Full capability will be delivered in FY16 after verification of CA and SAL capability. SDB will continue incremental development to pursue network centric interoperability. SDB is a key component of the Air Force's Global Strike Task Force CONOPs.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2011
- Source ID
- 655191_0604329F_5_3600_PB_2011
Related Documents
- Root: Small Diameter Bomb
- Child Accomplishment: MAJOR THRUST: Conduct Risk Reduction effort to prove out system concepts and models using sub-system prototype demonstrations.
- Child Accomplishment: MAJOR THRUST: Commence EMD to generate a design that delivers the capability described in the SDB II Capability Development Document (CDD)
- Child Accomplishment: MAJOR THRUST: F-15E aircraft Integration. Aircraft integration incorporates tests and targets, modeling and simulation (M&S), target lethality, data link and mission planning.
- Child Accomplishment: MAJOR THRUST: Provide Program Office Support for squadron to conduct operations to accomplish its mission.
- Child Accomplishment: MAJOR THRUST: Continue development and qualification of the MPACT High Pressure Air Compressor system as an alternate compressor system for the SDB weapon system.
- Child Cost Item: 0577bb80ca6e92d0c25dc75faad6704b
- Child Cost Item: f9169dc168d3f89b450835ad9366608e
- Child Cost Item: 06fa90f441aca839452d3133ee2fd7fa
- Child Cost Item: ef5d4d2e6fbd17b737f6a720126a029e
- Child Cost Item: 59d2f5f63aded475e29af673d593cb44
- Child Cost Item: ed648233d865d9ed8806185f6bc9c6d5
- Child Cost Item: df4aa801845b77694d9e5baf463013bd
- Child Cost Item: 33bf457c7147a6a491bed7a38d7b305b
- Child Cost Item: 10e4e844bea5826b26ca4c25cff63f7f
- Child Cost Item: b6e46398cb9bfca8792a8e0d743506af
- Child Cost Item: a31c7103c8433a3b499b8452a20e02b2
- Child Cost Item: 7c97d0badfb5aa35561097a3d48ed9c8