VC-25B

Abstract

The VC-25B Program, formerly known as the Presidential Aircraft Recapitalization (PAR) Program, replaces the Presidential VC-25A fleet which faces capability gaps, rising maintenance costs, and parts obsolescence as it ages beyond 30 years. The VC-25B Program delivers two new aircraft to meet the requirements for the President to execute the duties of Head of State, Chief Executive, and Commander-in-Chief. The VC-25B Program uniquely modifies two Boeing 747-8 commercial aircraft to provide the President, staff, and guests with safe and reliable air transportation with the equivalent level of communications capability and security available in the White House. The modifications to the 747-8 aircraft include an electrical power upgrade with dual Auxiliary Power Units that are usable in flight, a mission communication system, a work and rest environment, an executive interior, military avionics, a self-defense system, independent enplaning and deplaning, and independent baggage loading. No significant changes to the existing VC-25A Concept of Operations or Concept of Employment are expected. This budget provides for Post-Milestone B (MS B) design, integration, modification, product support and test of two aircraft to make them Presidential mission ready. Funds may be used to lease test equipment, as well as address emerging and short-notice Diminishing Manufacturing Sources and Material Shortage (DMSMS) issues. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. This program element may include necessary emergent or unanticipated civilian pay expenses required to manage, execute, and deliver VC-25B for emergent or unanticipated weapon system capability. The use of such programs funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY 2022 $3.924M was expended for civilian pay expenses in this program element, and in FY 2023 $5.217M is forecasted for civilian pay expenses in this program element. This program is in Budget Activity 5, System Development an Demonstration (SDD); however, it will not enter full rate production as stated below. This program is in Budget Activity 5, System Development and Demonstration (SDD) because it has passed Milestone B approval and is conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full rate production.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2024
Source ID
655250_0401319F_5_3600_PB_2024

Tags

Readers

  • Life Cycle Cost Analysis
  • Naval Mine Countermeasure Systems Development.
  • Public Financial Management and Budgeting

Related Documents