CH-47F Block II Engineering and Manufacturing Development (EMD)

Abstract

Conduct and support aircraft development and complete assembly of three (3) EMD test articles to include Advanced Chinook Rotor Blade (ACRB), airframe components, Improved Drive Train (IDT) and rotor components, light weight fuel system and electrical components. Complete fabrication, assembly, and initial functional checks of the GTV and remote control system (RCS). Conduct functional testing of the CH-47F Block II systems. Conduct Test Readiness Review (TRR) for EMD ground and flight testing. Release of EMD flight test software. Begin contractor led system level ground and flight testing. Deliver documentation that demonstrates requirements verification and production configuration baseline. Continue Integrated Logistics Support (ILS) and Integrated Contractor Supply (ICS) support for initial flight test activities.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2020
Source ID
65598dad77fc60d37d2ce811c6cf3d67

Tags

Fields of Study

  • Physics

Readers

  • Aerospace Engineering
  • Logistics and Supply Chain Management.

Related Documents