Next-Gen OPIR Space GEO

Abstract

Next-Generation Overhead Persistent Infrared (Next-Gen OPIR) Geosynchronous Earth Orbit (GEO) (Project 657120): The primary mission is to provide initial missile warning of a ballistic missile attack on the US, deployed forces and allies. The Next-Gen OPIR GEO (NGG) missile warning satellites enhance detection and improve reporting of intercontinental ballistic missile launches, submarine ballistic missile launches, and tactical ballistic missile launches. Development consists of new payloads in a highly resilient bus, providing real-time persistent global infrared coverage to meet validated Joint Requirements Oversight Council (JROC) requirements on current and future space domain demands. The Program Office is acquiring the NGG capability in two contract actions. Phase 1 awarded in August 2018 encompasses requirements analysis, design/development, critical path flight hardware procurement, and risk reduction efforts leading to a System Critical Design Review (CDR) in October 2021. Phase 2 was awarded in January 2021 for the manufacturing, assembly, system integration and test, launch, and early on-orbit test through operational acceptance of NGG satellites 1-3. The Department has assessed the third Satellite Vehicle (SV) is not required as a result of continued positive performance of the Space-Based Infrared System (SBIRS) constellation and the anticipated full operational capability of the Medium Earth Orbit (MEO), Program Element 1206447SF/ Low Earth Orbit (LEO), Program Element 1206446SF missile tracking constellation. As a result, the program has removed the third satellite development efforts. NGG is now a two SV baseline. The NGG program has been designated as a Major Capability Acquisition. NGG program prior year costs from PE 1206443SF (Next-Gen OPIR - GEO), Project 657120 (Next-Gen OPIR Space GEO) of $1,159.3 million. This program element may include necessary civilian pay expenses required to manage, execute, and deliver Next-Gen OPIR GEO system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF and 1206398SF. This program is in Budget Activity 5, System Development and Demonstration (SDD) because it has passed Milestone B approval and is conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full rate production.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2025
Source ID
657120_1206443SF_5_3620F_PB_2025

Tags

Readers

  • Aerospace Engineering.

Technology Areas

  • Space
  • Space - Satellites

Related Documents