Counter Satellite Communications System
Abstract
Acquisition Decision Memorandum (ADM) April 24th 2009, directed all capabilities identified in the Oct 4th 2006 CCS Block 20, Joint Requirements Oversight Council (JROC) approved Capability Development Document (CDD) shall be accomplished as Pre-planned Product Improvement Program (P3I) upgrades to the Counter Communications System (CCS) Block 10. On April 11th 2016, Air Force Space Command (AFSPC) signed and updated ADM adding additional responsibility for CCS Block 10.3 Meadowlands. CCS provides expeditionary, deployable, reversible offensive space control (OCS) effects applicable across the full spectrum of conflict. It prevents adversary Satellite Communications (SATCOM) in Area of Responsibility (AOR) including Command & Control (C2), Early Warning and Propaganda, and hosts Rapid Reaction Capabilities in response to Urgent Needs. This program effort includes architecture engineering and studies, system hardware design and development, software design and integration, and testing and demonstration of capabilities to provide disruption of satellite communications signals. The FY 2021 funding request was increased by $31.266 million for the Fix CCS for C4I and increased by $0.966 million for the JETSS Architecture Realignment.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2021
- Source ID
- 65A001_1206421SF_5_3620F_PB_2021
Related Documents
- Root: Counterspace Systems
- Child Accomplishment: Counter Communications System (CCS) Pre-planned Product Improvement (P3I) Program
- Child Cost Item: 839f780016b6bfac5646ceec5fe47657
- Child Cost Item: 2d0def38f4138221e9a0e54b6ea4b5cb
- Child Cost Item: addd7e045096e6682c8b71e526ea60af
- Child Cost Item: 959c5a790e5f8ee3d8338a656a627134
- Child Cost Item: 5e704b6e6d14982230f6aa5954338c58
- Child Cost Item: dc3de0f8d6f83e01656881fa3ffe9d38
- Child Cost Item: 19d8d70260655503d71fcefc534fc3bc
- Child Cost Item: 113355690acbcfecaf4dcf62ab149d1c
- Child Cost Item: 2eb5de6d65eceefee9343d56c7dc3ec7