Prototype Upgrade to LRIP Configuration

Abstract

After a successful Milestone C, eight (8) prototype vehicles will be updated to the initial LRIP configuration to support LRIP phase survivability testing, logistics products development, and implementation of design changes driven by Production Qualification Testing (PQT) and Initial Operational Test and Evaluation (IOT&E). Upgrading MPF prototypes to LRIP configuration will result in substantial cost avoidance compared with producing additional LRIP vehicles to support test requirements.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2024
Source ID
666cf41191f4e9d8fdbcaeccf9e0c152

Tags

Fields of Study

  • Computer science

Readers

  • Life Cycle Cost Analysis
  • Munitions and Ordnance Engineering
  • Software Engineering

Technology Areas

  • 5G
  • 5G - DoD 5G Program
  • 5G - Internet of Things

Related Documents