B-52 AEHF Integration
Abstract
The B-52 Advanced Extremely High Frequency (AEHF) Integration satellite communications (SATCOM) system provides a survivable, low probability of intercept/detection, high bandwidth system that ensures secure intra/inter-flight and two-way command and control communications in the modern anti-access/aerial denial battle space. This communications upgrade replaces the Military Strategic and Tactical Relay (MILSTAR) Ultra High Frequency (UHF) SATCOM capability (MILSTAR is nearing system end of life) on the B-52. The AEHF Integration effort will integrate the radio, antenna and system components required to provide two-way satellite communication for the B-52. Funds may be used to address requirements including, but not limited to, emerging and short-notice Diminishing Manufacturing Sources and Material Shortages (DMSMS) for both aircraft and associated training systems, Development Testing (DT)/ Operational Testing (OT), and safety of flight issues. Additionally, funds may accommodate Program Management Administration (PMA) and support, civilian pay expenses, rapid technology insertion, and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. As AEHF Integration provides future communication growth to the B-52, emerging security/certification requirements (nuclear certification, cyber security, program protection, crypto modernization, etc.) as well as other aircraft upgrades may require studies and/or support for potential impact to AEHF. Funds will be used to conduct development and test activities. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605827F, 0605828F, 0605829F, 0605831F, 0605832F, 0605833F, 0605898F, 0606398F. In FY23 2.440M was expended for civilian pay expenses in this program element, and in FY24 3.146M is forecasted for civilian pay expenses in this program element.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2025
- Source ID
- 671810_0101113F_7_3600_PB_2025
Related Documents
- Root: B-52 Squadrons
- Child Accomplishment: B-52 AEHF Integration
- Child Cost Item: 4c7f80c9ce0f06765c6c54dd02ec5602
- Child Cost Item: 8ac9ac8a4af0992105eefa81f87dec61
- Child Cost Item: baa74dd5f805ef64ac43b976032d4d2b
- Child Cost Item: 5aa2f172914d39b215bf76aef5d5d79c
- Child Cost Item: 2b48131c44ecb170ffd1dff1725c9f0d
- Child Cost Item: c216eb416b2d2f5294f2d4541e442418