MM III Baseline Support
Abstract
MM III Baseline Support program replaces or upgrades obsolete/unsupportable flight test unique equipment installed on the missile during flight test, used to test MM III systems on the ground, or located at test facilities to collect, process, and analyze test data. Flight test equipment supports test and evaluation of MM III capabilities, and MM III Operational Test Launches (OTLs) to determine ICBM force readiness, reliability and capability shortfalls. Efforts include development, qualification, integration and testing of replacement equipment such as LGM-30G Flight Test Telemetry and Termination System (FT3) and LGM-30G Higher Authority Command Test System (HACTS) 2.0. As other similar equipment is identified for replacement, it will be added to this program. MM III Baseline Support also provides for other MM III unique government costs, studies of system performance, contract closeout costs, cost trades and acquisition planning activities, up to and including proposal preparation, for future capabilities. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such programs funds would be in addition to the civilian pay expenses budgeted in program elements 0605831F and 0605833F. In FY 2021 1.100M was expended for civilian pay in this program element, and in FY2022 1.100M is forecasted for civilian pay expenses in this program element.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2023
- Source ID
- 672984_0101213F_7_3600_PB_2023
Related Documents
- Root: Minuteman Squadrons
- Child Accomplishment: LGM-30G Arm Disarm Switch Replacement (ADSR)
- Child Accomplishment: LGM-30G Flight Test Telemetry and Termination System (FT3)
- Child Accomplishment: LGM-30G Higher Authority Command Test System (HACTS) 2.0
- Child Accomplishment: LGM-30G Baseline Support
- Child Cost Item: 0bd97378225cae3d3b0ba92d8046ce9c
- Child Cost Item: 2485448efa31b4fd7c72ee9dbd83f8c3
- Child Cost Item: fdf734e1bee07781eb7e794754baf35b
- Child Cost Item: b2bbb63dbf7e41aed804e47bee9f1b51
- Child Cost Item: 20af63b2fe59e0f023b5856cc6a5fe00
- Child Cost Item: 186e7a31a30e6f476783ed3d55cceef4
- Child Cost Item: 90820fe1a2fbd3921579e257aeb93051
- Child Cost Item: 86b0eda0f82ab30364a4cf9ecb729e49
- Child Cost Item: f2916ffacd092391c2374ccc0f99e5c2
- Child Cost Item: 2249d712f507153a701359913cfa50f9