JDAM DEVELOPMENT

Abstract

The 5000 lb demonstration is an integration of BLU-113 warhead with an existing production tail kit, scaled if necessary from smaller or larger warhead control design, to provide accurate, precision, reliable, hard target penetration capability. The required accuracy shall be "JDAM like" as defined by the operational requirements community. The greater overall system performance will tighten dispersion capability where multiple weapons are released from the same aircraft on the same pass, and hit the same impact crater. The BLU-113 is an objective requirement of the 2002 JDAM Operational Requirements Document (ORD). Weapon system will have an identical Concept of Operations (CONOPS) as existing USAF inventory for Global Positioning System-aided Inertial Navigation System (GPS-aided INS) weapons, and compatibility with aircraft Operational Flight Profile (OFP). BA-07 - This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2015
Source ID
674138_0604618F_7_3600_PB_2015

Tags

Readers

  • Aerospace Engineering
  • Explosive Engineering.
  • Marksmanship and Weaponry.

Technology Areas

  • Space

Related Documents