Avionics Modernization Program

Abstract

Avionics Modernization Program (AMP): AMP implements Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM), navigation/safety capability and the All Weather Flight Control System (AWFCS). It installs directed navigation/safety equipment: Terrain Awareness and Warning System (TAWS) and Traffic Alert and Collision Avoidance System (TCAS), reducing the threat of controlled flight into terrain and mid-air collisions. CNS/ATM capability requirements are incorporated in the aircraft to meet current and future International Civil Aviation Organization (ICAO)/Federal Aviation Administration (FAA) requirements and to progress toward Next Gen Air Transportation System. AWFCS replaces low reliability line replaceable units (LRUs) in the automatic flight control system and replaces aging, non-supportable mechanical instruments in the engine and flight systems. Connectivity to mobility command and control capabilities is also incorporated in the AMP design. The TCAS portion was accelerated ahead of the rest of the AMP mod and was completed 31 Oct 02. The portion of avionics capability required for modernization that does not complete at the end of AMP development will be captured and funded in RERP. All other avionics capability will be captured in a separate follow-on block upgrade program. AMP requirements have been expanded to incorporate updates to the new avionics architecture, to include security enhancements to the Global Positioning System. Equipment Diminishing Manufacturing Source (DMS) issues will be resolved to support continued operations through studies, development, and redesign efforts. FY 2010/2011: Funding required for development of the Pilot Assist Capability/Servo (PAC/Servo) capabilities for insertion in aircraft that have previously completed the AMP modification. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2012
Source ID
674495_0401119F_7_3600_PB_2012

Tags

Readers

  • Aerospace Engineering
  • Aviation Safety and Air Traffic Management
  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control
  • Space

Related Documents