Avionics Modernization Program (AMP)
Abstract
The 2013 National Defense Authorization Act (NDAA) required an Institute for Defense Analyses (IDA) cost/benefit analysis (CBA) of the C-130 Avionics Modernization Program (AMP) and a reduced scope mod program; it also prevents the Air Force from cancelling C-130 AMP until 90 days after the study is delivered to Congress. The Air Force delivered the study to Congres in Nov 2013. However, the FY14 NDAA directed the GAO to conduct a sufficiency review of the IDA study by 1 April 2014, and prevents the AF from canceling C-130 AMP.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2015
- Source ID
- 674885_0401115F_7_3600_PB_2015
Related Documents
- Root: C-130 Airlift Squadron
- Child Cost Item: 9f24d8878f115afe8be59d2a3daa4d7e
- Child Cost Item: b70e257e24e1eb5e588a15a2c7a47895
- Child Cost Item: 7d6a3cdf4a4ddbabc2040ac76dc2740e
- Child Cost Item: 6015620e44198fc497b6b5fa8ae9eebc
- Child Cost Item: 746ab025eb20a3f34d6f01d65dba7d30
- Child Cost Item: c3b55f74c2fdcc3a1a515b06c6882862