IW1/Mk21A

Abstract

The Mk21A Reentry Vehicle (RV) program will design, develop, produce and deploy an integrated RV capable of delivering the W87-1 Warhead when released from the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile (ICBM). The Mk21A will provide needed performance and security enhancements over the Mk21 reentry vehicle to meet the upgraded requirements for the Department of Energy W87-1 warhead. The Mk21A will also meet the requirements laid out in the Ground Based Strategic Deterrent (GBSD) Capability Development Document (CDD) as directed by Air Force Global Strike Command. The major activities in the Technology Maturation and Risk Reduction (TMRR) phase of the Mk21A RV program include: (1)Trade Studies; (2) Prototype designs; (3) Government systems engineering, analytics, and test capability development, (4) RV Risk Reduction, and (5) Weapon System (WS) Integration Risk Reduction. Reentry vehicle components include: high velocity nose tip, high impulse transducer, fuze, aero shell forward section, body section and rear cover, radio frequency subsystem with antennas, RV spin-up system, inflight disconnect cable and other electrical cables. The Mk21A program will include prime contractor development of applicable support equipment, data, flight test hardware, infrastructure, and training materials while examining and mitigating weapon system integration risks, and nuclear surety, hardness and certification and system vulnerability assessments. This program element includes necessary civilian pay expenses required to manage, execute, and deliver Mk21A RV weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605833F. As directed in the FY 2018 NDAA, Sec 825, amendment to PL 114-92 FY 2016 NDAA, Sec 828 Penalty for Cost Overruns, the FY 2018 Air Force penalty total is $14.373M. The calculated percentage reduction to each research, development, test and evaluation and procurement account will be allocated proportionally from all programs, projects, or activities under such account. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2020
Source ID
674920_0101328F_7_3600_PB_2020

Tags

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Missile Defense Systems.

Related Documents