C-5 Block Upgrade

Abstract

C-5 Block Upgrade: Purpose of this program is to provide a measured approach to implement a common baseline for the C-5 fleet in order to allow insertion and integration of new/future capabilities and replacement of future unsupportable equipment. Software (S/W) and hardware (H/W) baselines between the Avionics Modernization Program (AMP) and Reliability Enhancement and Re-engining Program (RERP) have diverged. S/W deficiencies corrected under AMP sustainment (Block Cycle Changes) reappear in RERP. C-5 AMP system has a total of two Core Processor Module (CPM) cards; C-5 RERP system has a total of three CPM cards. Originally, AMP was to have 50% spare processing and memory capability; AMP’s CPM-1 and CPM-2, respectively, have only 22% and 19% throughput capability remaining. AMPs throughput/capacity constraint does not allow room for any new/future capability and contributes to current computer problems. Failure to upgrade the C-5 AMP system to the 3 CPM RERP configuration will affect mission capable rates, will inhibit the ability to fix current Deficiency Reports (DRs)and drive increased sustainment costs associated with S/W and H/W baseline divergence. The C-5 Block Upgrade Program development requirements complete in FY11. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2012
Source ID
675353_0401119F_7_3600_PB_2012

Tags

Fields of Study

  • Computer science

Readers

  • Aerospace Engineering

Related Documents